FIRE: The Department responded to a total of 340 alarms. This is an average of 11.3 alarms per day. There were 47 fire alarms, 25 public service calls and 268 rescue and EMS calls. The total estimated fire loss was $40,500.00. There were no firefighter or civilian injuries due to fires. 6/2/2008: I had lunch with Jackson Township Chief Heck to discuss issues of interoperability among our agencies. 6/3 and 6/17/2008: I attended Executive Board meetings of the Stark County Hazardous Materials team. The Hazardous Materials team is being overhauled at the County level. 6/4/2008: I attended the Stark State College Advisory Board meeting. 6/6/2008: The Department experienced a series of mechanical problems with Rescue 218, Rescue 219 and Rescue 220 (ambulances). We had to use the 1989 Vehicle Extrication Rescue truck as the west side ambulance for four days. Two of our first line Rescue ambulances are 11 years old. In the history of the Fire Department, we have replaced these trucks after no longer than 8 years. I anticipate this problem will worsen unless it is addressed. 6/9/2008: I met with the private ambulance companies to discuss their response during the Cruise-On- In and Dance show. 6/10/2008: I met with Chief Dorman of the Boardman Township Fire Department to discuss common issues. 6/11/2008: I met with the duty crew to go over operations at the Cruise-On-In and Dance show. I also met as part of the SCOG Governance Board to develop and implement a County-wide 911 dispatch center. 6/14/2008: The annual Cruise-On-In and Dance show was held. The Department covered the needs of the City well and responded to several EMS incidents at the show itself. I believe the safety plan we have in place is a good one. 6/19/2008: I met with Greg Souder of the Public Entity Risk Services as part of the annual City-wide risk management procedure. 6/23/2008: Randy Stuck retired as Fire Inspector after 27 years of service. Additionally, Jimmy Swain and Jim Coughlin were sworn in as probationary firefighter/paramedics. 6/24/2008: Civil Service Director Rick Gatien, Chief Volkert of Dover Fire Department and I met with representatives of Pradco Psychological Consultants to discuss psychological evaluations for new employees. 6/26/2008: The SCOG Governance Board By-Laws committee met. Annual hose testing was begun. It is regularly scheduled for May, but due to the accident and inclement weather it was put off until June. The Fire Department began its series of physical exams as a part of the fitness and wellness grant. The fitness equipment was delivered to all of the stations and was well received. I believe this is a positive step toward fitness for the Department and wellness for its members. We reviewed out policies and procedures for emergency response as compared with: applicable state law, literature on effective emergency response, policies and procedures from across the nation and policies and procedures from across the County. Two common underlying priorities I have found that will be benchmarks for any changes made to our SOPs’ include: 1. The safe arrival of the emergency vehicle at the emergency scene; 2. Driving to compensate for the unexpected and/or inappropriate actions of other drivers. The Administration is currently reviewing what, if any, charges are to be made.

POLICE; Arrests: Total Adult Arrests 61; Total Juvenile Arrests 8; Summons/Citations Issued 23. Incidents: Total Calls 2,052; Security Checks Performed-Residences & Business Locations 216; Incident Cases Reported 86; Crimes Against Property Reported 154; Crimes Against Persons Reported 78; Accident Reports 88; Traffic Citations Issued (will be reported in next month’s report); Alarms 142; Miles of Road Patrol (mileage from previous month) 44,610. Officers: Compensatory Hours Used 163.3; Sick Hours Used 94.5; Personal Hours Used 160.0; Compensatory Hours Earned 1,142.8; Overtime Hours Earned 390.3.

METERMAID: Total number of tickets issued 148; By parking enforcement 137; By police officers 4; Towed vehicles with tickets 7. Outstanding tickets 341. Total number of PAID violations 113; Number of parking permits issued 247. Revenue received from PAID violations (including hearing fees) $980.00; Revenue received from parking permits $1,615.00. Total Revenue: $2,595.00.

ENGINEERING: ANNEXATION: Prophecy Massillon Annexation: Filed at County on September 6, 2007. Hearing date November 29, 2007. Approved by Stark County Commissioners. Revised to account for Navarre’s annexation of the County Farm. Accepted by Council on March 3, 2008. A request has been submitted to City Council to rezone this property to I-2 General Industrial District. Poets Glen Area Annexation: The petition was filed with Stark County on February 5, 2008. The hearing will take place in City Council Chambers on April 9, 2008 at 7:00 p.m. The annexation was approved by the Commissioners at the April 9th meeting. The Township has filed an appeal on the Commissioners’ decision. Manson Area Annexation: The petition was filed with Stark County of February 5, 2008. The hearing will take place at the Tuscarawas Township Administrative offices on April 16, 2008 at 7:00 p.m. The annexation was approved by the Commissioners at the April 16th meeting. The Township has filed an appeal on the Commissioners’ decision. BRIDGES: Tremont Avenue Bridge: Detour began February 21, 2005. The requested federal earmark for this project was denied. A new request was filed through Congressman Regula’s office. ODOT has informed us that they are providing the 20% match for both the Municipal Bridge and SCATS funding. The current estimate for this project is $3.3 million. A permit with the Army Corps of Engineers has been secured as was permits form Norfolk Southern & RJ Korman Railroads. Plans have been submitted to ODOT for approval. Anticipated bid opening is in April 2008. AT&T began their relocation work. Bids will be opened May 1, 2008 at the Stark County Commissioners office. Bids received were more than 10% over the engineer’s estimate and therefore the project must be re-bid. A request has been submitted to SCATS to increase the City’s portion of the funding. SCATS approved additional funding for the City in the amount of $450,000.00. Also, the County has increased its share by the same amount. This project has been re-bid and bids will be opened on July 3, 2008. Erie Street Bridge: A pre-bid meeting took place on august 30, 2007. Project was bid out fall of 2007. The current estimate is $1.8 million. Keffler Construction of Canfield, OH, was awarded the contract. Work has begun and is to be completed by October 2008. The bridge will be re-decked, widened to 3 lanes and a sidewalk will be added. Finefrock Road Bridge: Scheduled for re-decking in 2009. City and County resurfacing completed on October 21, 2006. US 30 Bridge Project: Ruhlin selected as contractor, began work on September 5, 2006. 32nd Bridge Replacement: Survey completed. Design 60% completed. SANITARY SEWERS: 2000 WWT Plant Upgrade & Expansion: City is investigating odor control solutions. Tertiary filters have been put on line. The Law Director has entered into contract on behalf of the City with the law firm of Bricker & Eckler LLP to deal with the change orders submitted by Kokosing and also remaining items to complete the contract. A draft of the odor control study has been completed. Final payment has been made to Kokosing. A mediation date has been set for May 7, 2008 in Columbus. A mediation took place at the offices of Bricker and Eckler on May 7, 2008. Results of the mediation were that the City would settle with Kokosing for an amount of $525,000.00 and would receive back 10% of any net monies Kokosing would obtain from a pending arbitration with CTI. The City will apply for a supplemental loan from the Ohio Water Development Authority, which would be added to the total current loan amount from the upgrade in the amount of $525,000.00. 27th Street/Bison Avenue Sanitary Sewer: 90% design completed. This project would be completed to assist the proposed Poets Glen Annexation. Nova Tech Pump Station: This project will replace the existing pump station. The design is 80% completed. STREETS: Wales Rd./SR241 Rehabilitation: The funding request from SCATS for engineering was denied and we will be re-evaluating the scope of the project. The new project scope will be to improve the intersections of Lake/Wales and Hankins/Wales. Also included are the intersections of Erie/Tremont and Jackson (27th)/Lincoln Way East. URS has been selected as the consultant. Currently awaiting ODOT to issue a Notice to Proceed. Starting to survey. 2007 Street Resurfacing: Bid opening September 14, 2007. Superior Paving low bidder. Began the week of October 28, 2007. Paving completed as of November 28, 2007. Punch list is completed. 2007 Target Area Street Resurfacing: Bid opening September 14, 2007. Superior Paving low bidder. Began the week of October 29, 2007. Paving completed as of November 28, 2007. Punch list is completed. 9th Street S.W. Reconstruction: Will be submitted to OPWC for funding. Currently compiling survey data and starting design work. Nave/Erie St. Intersection Improvement: Currently analyzing improving the intersection. 2008 Street Resurfacing: Compiling and evaluating street lists. 2008 Target Area Street Resurfacing: Compiling and evaluating street lists. 2008 Lincoln Way W./Lincoln Way E. Project: Preparing bid documentation and estimate to resurface Lincoln Way from Tommy Henrich N.W. to 3rd Street N.E.; rehab sanitary and storm manholes, storm inlet rehabilitation and curb ramp installation. Expect to bid in July 2008. SUBDIVIDIONS: Ballinger Estates: Preliminary plat approved by Planning Commission November 10, 2004. Plans submitted and approved. Sanitary sewer plans approved. Final plat approved by Planning Commission June 22, 2005. Council approved July 5, 2005. Plat recorded. Grading and utility construction completed. Houses almost completed. Roadway installed week of April 10, 2006. Working on punch list items. Ready to switch to one year maintenance bond. Ballinger Estates Phase No. 2: Preliminary plat approved by Planning Commission December 13, 2006. Final plat approved by Planning Commission 2/21/07. Re-zoning passed by Council. Plans have been approved, construction began week of July 16, 2007. Sewers and streets 100% completed. Punch list items to be done summer 2008. Working on concrete work and landscaping. Centennial Village: Preliminary plat and rezoning approved by Planning Commission February 13, 2002. Revised preliminary approved May 8, 2002. Plans approved. Final plat approved by Planning Commission and Council. Plat recorded. Site work began week of September 23, 2002. Sanitary completed and tested. Roadway installed week of May 5, 2003. Easements relocated. Street signs installed. Bond transferred to Roseman Construction. Punch list items to be completed. Cherry Springs No. 1: Plat submitted and approved March 2006. Plat approved by Planning Commission and Council March 2006. Plat recorded. Homes being built. Cherry Springs No. 2: Planning Commission April 12, 2006. Council May 1, 2006. Plat recorded. Earthwork began week of October 9, 2006. Sanitary sewer installation began week of December 18, 2006. Sanitary completed. Testing started 2/21/07. Testing of the sanitary sewer is 95% completed. Concord Village Outlots: Plat approved by Planning Commission and Council. Storm and sanitary easements acquired. Plat recorded. Sanitary sewer installed. Sewer testing 100% completed. Grading and ditch work 75% completed. Transferred to Nancy Villas (Perciballi). Houses being built. Punch list items to be completed summer 2008. Concord Village Allotment: Preliminary plat approved by Planning Commission March 9, 2005. Plans submitted and approved. Final plat to Planning Commission September 13, 2006. Approved by Council October 16, 2006. Plat recorded. Construction began the week of March 26th 2007. Paving completed week of June 25, 2007. Homes are currently being constructed. Punch list items to be completed in spring 2008. Punch list items to be completed summer 2008. Forest Hills No. 3: Plat recorded. Plans re-approved. Construction began July 2004. Curb installed week of August 23, 2004. Asphalt installed. As-builts received. Punch list items to be completed. Awaiting installation of the street lights. Gray Ridge Estates Phase No. 1: Preliminary plat submitted to Planning Commission March 9, 2005. Final plat approved by Planning Commission and Council February 2006. Earthwork began week of July 31, 2006. Pre-construction meeting August 21, 2006. Sanitary sewer installation and testing complete. Utility construction 75% completed. Sanitary trunk sewer extension completed. Homes are currently being constructed. Curb and pavement installed week of May 14, 2007. Seeding/grading and punch list items to be completed. Reconstruction of 27th Street S.E. completed. Kenyon Creek Estates Phase No. 1: Preliminary plat received week of December 4, 2000. Revised and approved by Planning Commission February 13, 2002. Phase 1 plan submitted February 20, 2002. Earthwork began week of July 22, 2002. Kenyon Creek Estates Phase No. 1: Preliminary plat received week of December 4, 2000. Revised and approved by Planning Commission February 13, 2002. Phase 1 plan submitted February 20, 2002. Earthwork began week of July 22, 2002. Utility work began week of October 21st. Plat approved by Planning Commission March 12, 2003 and Council April 7, 2003. Construction 80% completed. Roadways paved. Water line extension completed. Plat recorded. Lots being sold. Punch list items to be completed. Kenyon Creek Estates Phase No. 2: Plans submitted and approved May 22, 2003. Plat approved by Planning Commission and Council. Plans approved. Waiting on Performance Bond. Nova East Industrial Park: Plat and plans approved. Road construction is 75% completed. Land sold to Beaver Excavating May 2001. Water and gas lines completed. Plat approved by Planning Commission May 12, 2004. Plat approved by Council June 7, 2004. Plat recorded July 2004. Street signs installed. As-builts received. Final paving done week of November 8th. Street light installation completed. Several tenants under construction. St. Luke Development: Plat approved by Planning Commission and Council. Plans approved May 20, 2004. St. Luke received the PTI on August 25, 2004. Performance Bond received. Construction has begun on sanitary sewer. Plat recorded at County. Sanitary sewer installation completed. Awaiting testing. Two site plans have been reviewed and approved. Waiting for roadway construction. Project has been put on hold by developer. Sippo Reserves Allotment Phase No. 1: Preliminary plat approved by Planning Commission December 8, 2004. Plans submitted and under review. Plans approved. Earthwork began week of August 22. Sanitary sewer installation began week of September 19th. Final plat approved by Planning Commission July 13, 2005. Council September 6, 2005. Underground utilities completed. Curb installed week of April 17, 2006. Asphalt completed. Sewer testing completed. Homes being built. Sippo Reserves Allotment Phase No. II: Plat approved by Planning Commission and Council. Construction to begin in fall 2008. University Village No. 9: Preliminary plat submitted and approved by Planning Commission December 10, 2003. Variance granted for plat at February Planning Commission meeting. Plans approved May 2004. Grading work began July 2004. Utility work began week of August 23, 2004. Curb placed October 27, 2004. Asphalt paving done week of November 8, 2005. Plat recorded. Construction 100% completed. Telephone pole finally removed from roadway. Street lights installed. Punch list items to be completed. Westbrook Estates West: Preliminary plat approved by Planning Commission May 9, 2001. Rezoning approved by Council July 2, 2001. Plans reviewed and approved. Site work began week of August 12, 2002. Sewer installation completed September 26, 2002. Sewer to be tested. Plat approved by Planning Commission November 20, 2002 and Council December 2, 2002. Roadway installed November 2002. Plat recorded. Construction completed. Lots being sold. Punch list items completed by Lockhart in August 2007. Allotment released to City of Massillon on May 6, 2008. Westbrook Estates West Phase No. 2: Final plat to Planning Commission May 12, 2004. Council approved June 7, 2004. Plat recorded. Lots are currently being sold. Allotment released to City of Massillon on May 6, 2008. Westbrook Estates Phase No. 3: Plans sent in December 2005 and under review. Revised plans sent April 27, 2006. Plat submitted May 30, 2006. Approved by Planning Commission June 14, 2006 and by Council. Grading work 75% completed. Utility work began the week of April 16, 2007. Utilities 75% completed. Grading for roadway. Construction to resume in the summer. Woodland Creek: Preliminary plat approved. Plans approved by City and EPA. Plat for condo phase recorded at County. MISCELLANEOUS: 402 Intersection Safety Study: Received ODOT funding for Tremont/Erie, Lincoln Way Est/27th Street Intersections. It is anticipated these projects will commence in 2009. 151 Lincoln Way East Improvements: The contractor that was the lowest and best bidder has held his price from the 2007 bid and will complete this project in the fall 2008. SR241/Temont Intersection Improvements: ODOT approved grant. To be constructed in 2009. 27th/Lincoln Way East Intersection Improvements: ODOT approved grant. To be constructed in 2009. Ohio Utility Protection/Safety Committee: Next meeting date has not been set. Storm Water Report: Preparing to submit 2007 Annual Report. A brochure has been completed regarding erosion control for homebuilders and is being distributed through the Building Department and meets a requirement by OEPA for the public education section of our Storm Water Management Plan. The 2007 annual report has been submitted to OEPA. Storm Water Mapping: 96% completed. SE drawings completed/SD drawings. Sanitary Sewer Mapping: 96% completed. SE drawings completed/SD drawings. Permits and GIS are being added to the database and are 18% complete. Editing files to include pipe length and slope/material. SRTS Funding: Submitted a letter of interest to ODOT for Massillon City Schools for funding to develop a safe route to school plan for the district. Submitted an application requesting funds to develop a SRTS plan. Funding has been approved to develop the plan per the application. Will be working with ODOT’s selected consultant on plan development. GIS: Completed transferring items to ESRI. Setting hyperlinks. Modifying display and addressing and permits, maps. Continuing to update. Keuper Storm Sewer: Relocation design is complete. Submitted to OPWC in September for funding. Project estimate is $335,000.00. Project was approved by district 19. This project will be bid out in July 2008. Augusta Lakes Drainage: Survey completed. Holderbaum Sewer & Drain will be installing a catch basin and 400 feet of 18” pipe to alleviate flooding problems in January 2008. Installation completed. Restore in the spring. Outdoor Warning Sirens: Prepared bid documents and specs. – out to bid. Bids were opened June 24, 2008 and are currently being reviewed. Web Site: Currently developing an Engineering Department web site and updating web site maps.

COMMUNITY DEVELOPMENT: 1. The CD Department began the process of closing out its FY 2007 CDBG Program in preparation for the start of its FY 2008 Program Year, which begins July 1. The City’s annual performance report on the FY 2007 CDBG Program must be submitted to HUD by September 30. The City is completing the required environmental review process for its FY 2008 CDBG funded projects. 2. The CD Department continued to work on the Shearer’s Foods Project. Shearer’s has filed an application for tax abatement under the Enterprise Zone Program for this development. This application is currently undergoing the notification process before it can be formally submitted for Council review and approval. 3. The CD Department also continued to participate in meetings with the Visconsi Company regarding the proposed sale and redevelopment of Genshaft Park. The developers have requested that the City rezone the project site from light industrial to general business. This rezoning is currently before City Council. In addition, the developers are considering the possibility of seeking Tax Increment Financing (TIF) to fund needed site improvements. Under a TIF, tax payments are returned to the local government and used to pay for those public improvements that directly benefit an economic development project. 4. The City will continue its participation in the Stark County HOME Consortium for an additional 3 years (2009-2011). Under the HOME Program, HUD allocated federal housing dollars to the Consortium to be used for housing improvement programs. Massillon uses its share of these dollars for housing rehabilitation and homebuyer assistance.

HOUSING: The Department received approximately 75 calls and visits regarding Fair Housing Laws and tenant/landlord issues. It was necessary to provide information to numerous tenants and landlords regarding their rights. Several people were referred to Community Legal Aid Services, Inc. for legal advice or other agencies for homeless prevention or financial assistance. This office continues to monitor questionable advertisements listed in the classified section of the local newspaper for possible discrimination. Aane Aaby and I participated in an event with the Health Foundation of Greater Massillon and Stark Community Foundation to present checks to neighborhood associations. Aane and I, along with representatives from the Health Foundation and Stark Community Foundation had previously met to allocate funding to the Associations. New Associations have been formed and completed the Neighborhood Training Classes. I am pleased that additional groups are forming and taking an interest in their neighborhoods. I participated in the Community Building Partnership (CBP) of Stark County Operating Committee session. During this quarterly meeting, we discussed the Director’s report, resource development, updated program results and the 2008 budget report. We also conducted a Community Development Corporation project tour in the Canton and Massillon area. In Massillon, we visited Massillon Homes II, which is at or very close to 100% occupancy. As a member of the Stark County Interagency Council on Homelessness (SCICH) Evaluation Committee, we completed the site visits and evaluations for the HUD funded Homeless Prevention Programs. Homeless prevention is an important issue in all communities. I participated in the Save Our Homes (SOH) Coalition Outreach Program held in Massillon regarding foreclosure prevention. Even though attendance was disappointing, our office received several phone calls from people seeking help. The group continues to get the word out to Stark County communities about available assistance. I participated in a Family Economic Success (FES) meeting. We re-evaluated the operations for the past year, discussed plans for the new tax season and financial activity of the organization. The 2008-2009 meeting dates of the coalition were also discussed. FES continues to be a valuable organization that assists low-income families with free tax preparation. They also provide other financial information which includes predatory lending. I attended the Walnut Hills Residents Association meeting. Upcoming activities for the organization were discussed which included plans for summer events. They will be holding a basketball camp this summer for children in different age categories. They will also continue hiring off-duty police officers to patrol the neighborhood. This will be the second year and they are very pleased with the patrolling program. I participated in the Stark County Housing Trust Fund (SCHTF) Board meeting. We reviewed information provided last month by Mary Brooks, from the National Housing Trust Fund. We continue to discuss possible funding sources. I participated in a consultation meeting at the Stark County Regional Planning Commission office in order to provide input into the Consolidated Plan. Discussed at the session were the City’s needs regarding community development and housing for the next 5 years and establishing strategies and goals for addressing those needs. The Consolidated Plan is a requirement of HUD in order to obtain Community Development Block Grant (CDBG) and HOME Investment Partnership funding. I participated in the Stark County Housing Task Force meeting. Discussed at the meeting were reports regarding the Homeless Collaborative, Interagency Council and HUD/SMHA. Also present were members of Canton’s Community and Economic Development Department. They talked about programs and plans being implemented in Canton. Three applicants were approved to participate in the Home Buyer’s Assistance Program and one contract was signed for the rehabilitation portion. Three applications were accepted for the Emergency Housing Rehabilitation Program, nine contracts were signed and two projects were completed. One project was completed for the full Housing Rehabilitation Program, two are progressing and one project was solicited for bids.

BUILDING: Permits Issued: Dwelling Alterations & Additions 37 @ $186,257.00; Commercial (Alterations & Additions 4 @ $286,000.00; Industrial (Alterations & Additions) @ $26,600.00; Garages & Carports 2 @ $7,150.00; Garage Alterations 1 @ $6,000.00; Miscellaneous 3 @ $30,800.00; Swimming Pools 3 @ $50,550.00; Accessory Buildings 7 @ $17,700.00; Fences 10 @ $20,850.00; Razings 2 @ N/A/; Total Permits Issued: 71 @ $631,307.00. Inspections: Building 58; Electrical 72; Plumbing 18; Heating 22; Housing 205; Total Inspections: 375.

STREETS: Cold Mix: 4 Tons; Hot Mix: 80.13 Tons. Catch Basin Grates (new) 22. Patched streets throughout entire City; Sept streets throughout entire City; Removed advertisement signs from tree lawns and telephone poles throughout entire City; Cleaned off catch basins throughout entire City; Repaired catch basins throughout entire City; Mowed and Weeded throughout entire City; Boarded up 1 window and 1 door at vacant home located at 33 Arch St. S.E.; Replaced 16 catch basin grates that were stolen at Warmington Rd. S.E.; Replace 1 grate at Sterillite S.E.; Replaced 6 stolen grates at Millinium S.E.; Set up stage for concerts on June 13,19,26; Dropped off 51 barricades downtown for Car Show and posted detour signs; Dropped off 6 barricades to St. Barbara’s Church for the festival.

SEWER/WASTE COLLECTIONS: Our new customers numbered 17 and we had 21 customers whose service was discontinued. We picked up extra items for customers at 212 locations at an additional cost of $1,694.00. We had four (4) dumpsters placed on a temporary basis. Our expenses have really escalated this year. Repairs for our truck fleet and the cost of tires have really increased. Our fuel costs are another concern. I think it is inevitable that we will need to ask for a rate increase before year’s end. Most of the area waste haulers and other businesses have now included a fuel surcharge to their fees. That way, it looks like they are not raising their rates. The bottom line is that ALL businesses have been impacted by fuel costs. Summary: New Customers 17; Permanently discontinue 21; Temporarily Discontinued 4; Resume Service to Delinquent Customers, Paid in Full 1; Resume Service to Regular Customers 9; Transfers 7; Misses 4; Misc. Messages 22; Total of Clean-Ups with Charge 212; Total of Charges for Clean-Ups $1,694.00; Dumpster Activity-Containers Placed Temporarily 4; Total Charges for Dumpsters $345.00; Services Donated at No Charge $2,299.00; Empty Baskets Main Street 2X Week $400.00; Bags from Community Service Workers $150.00; Health Department Clean-Ups $100.00; Service to City Buildings $1,649.00.

INCOME TAX: Income Tax collections were up 6.65% from same time last year. For the year 2008, our total tax collections are up .94%. As always, these figures have been balanced with the records in the Auditor’s Office. Employee withholdings were up 5.9% from same time last year. Business profits were up 1.4% and taxes received from individuals were up 26%.

HEALTH NURSE: Clinics: Well Child Clinics: Infant & Preschool Age Patients 8; School Age Patients 2; Referred to Specialist or Private Physician 1. Immunization Clinics: Attended 86; Immunizations Administered 196. Hypertension Screening: Attended 13; Referred for Follow-Up 0. TB Testing Clinics: Administered 9; Positive Reactors Referred for X-Ray 0. WIC Clinics: Initial Certifications 35; Re-Certifications 115; Individual Midcert 21; Nutrition Education 112; Caseload 840. Community Nursing: Field Visits 59; Auxiliary Visits 419. Miscellaneous: The Zostavax Clinic has been well received. To date we have administered 22 doses. Cost is $170.00 per dose. The nursing division had been investigating and following up an outbreak of shigella in a local day care. Teachers and parents of children are being requested to contact their doctor if they have symptoms or call the Health Department for specimen collection instructions. These are then sent to the Ohio Department of Health lab for culture.

GOLF COURSE: Golf Course Revenue: We generated $115,752.06. Our yearly total is $330,000.76. The final four days of the month will not be included in the monthly report because they fell on a Monday. The revenue generated will be in the July report. This month was the 6th wettest June in history. 18 days of rain 7.76 inches and the average was 3.55 inches. Golf Course: The golf course still continues to be in good condition. Maintenance crew is working at eliminating many of the trouble bunkers and the ones that do not come into play on the course. Additional sand was purchased and installed in some of the bunkers. Specials for late June and July: Monday through Wednesday a foursome for $100.00 and large bucket of balls from 10:30 a.m. to 1:30 p.m. Fridays after 1:00 p.m. $25.00 per person. Junior Golf School started June 12th with Him Goodwin. Miscellaneous: Sales – Detail by Department using Fore Reservations: Green Fees $98,902.85 (6/2007) - $88,521.83 (6/2008); Cart Fees $5,042.00 (6/2007) - $4,704.00 (6/2008); Driving Range $2,371.00 (6/2007) - $2,581.00 (6/2008); Gift Certificates $2,194.00 (6/2007) - $1,930.00 (6/2008); Annual Memberships $1,950.25 (6/2007) - $995.00 (6/2008); Hotel Green Fees $11,598.00 (6/2007) - $12,657.00 (6/2008); House Charges $2,489.74 (6/2007) - $4,358.23 (6/2008).

SENIOR CENTER: Activities: *Chorus sang at 3 nursing homes: Shady Lawn, The Laurels and Hospitality House; *Participated at the Amherst Centre non-profit day of information. Had a food food stand for the Cruise-In; *Housing Department had a foreclosure seminar for the public. Unfortunately, not very well attended; *Gave a Birthday party for all members. 61 attended to hear “Red Skelton”, have dinner and birthday cake; *Beginning our Christmas in January 2009 project for the MOW shit-ins and Ascera Care Hospice. *All regularly scheduled activities continue. Volunteer Hours: May – 1,040; June – 0. Director: Attended two SARTA Board meetings and Civic Trust Board Award Luncheon.

EEO: I attended the June Civil Service Commission meeting. The commission discussed the status of the various Certification Lists. The list reveals that in the Fire Department certification list for Chief and Captain expires in 11/30/08 and Firefighter/Paramedics shall expire in 12/12/08, with a possibility of being extended for one year. All positions in the Police Department have expired. Health Department has expired, Laborer I has expired, Secretary expires on 8/9/08, Custodian expires on 11/9/08 and the WWT Plant Operator is good until March 28, 2009. The EEO Director has been involved in the litigation of a discrimination charge that has been filed with the Ohio Civil Rights Commission on April 7, 2008.

TRAFFIC CONTROL: The MPD issued a total of 135 traffic citations, this being 76 less than same time last year. The MPD made 10 arrests for OVI, this being 1 less than same time last year. Radar citations totaled 6, this being 68 less than same time last year. The MPD handled a total of 88 traffic accidents, this being 5 more than same time last year. There were 53 property damage accidents, 20 injury accidents, there were 15 accidents that occurred on private property. Of the above accidents, there were 10 hit-skip accidents. There were 4 accidents that occurred as a direct result of alcohol and/or drugs. There were 2 pedestrian accidents and 3 bicycle accidents. The MPD investigated 19 accidents involving juveniles with 9 injuries. There were 2 motorcycle accidents and no fatal accidents. There were 68 motor vehicles towed by the MPD, this being 2 more than same time last year. Of the above tows, 35 vehicles were towed from traffic accidents, 7 for traffic offenses, 17 as a direct result of an arrest, 7 for parking violations and 1 recovered stolen. There was 1 miscellaneous towed vehicle. The traffic officer mailed 0 certified letters in regards to junk and/or abandoned motor vehicles. The traffic officer mailed 0 title searches to the State of Ohio, Bureau of Motor Vehicles. The traffic officer was able to junk or title 5 motor vehicles. The traffic officer issued or acted upon 15 notices (48/72 hour and/or 10/20 day notices). The traffic officer sent numerous 2255s and driver’s licenses to the state. The traffic officer logged and filed several license plates and kept track of the motor vehicles awaiting court order for immobilization, confiscation or return to the owners. The traffic officer issued 5 parking citations. (Not: The traffic officer was on vacation for 2 weeks during this month). As of the last day of the month, there were 22 motor vehicles sitting upon the Police Impound Lots. Of the 22 vehicles, several are waiting for court order to dispose of them. Summary: Accidents 35 YTD 198; Traffic 7 YTD 36; Parking 7 YTD 99; Arrests 17 YTD 119; STL/REC 1 YTD 6; Misc. 1
YTD 2; Total: 68 YTD 460.

WWT; HEALTH; ANIMAL CONTROL;
BUILDING; STREETS; PAINT/SIGN;
SAFETY; INCOME TAX; PARKS & Please see attached sheets.
RECREATION; GOLF COURSE;
RECREATION; OUTREACH MEALS
PROGRAM; PARKS

LATE REPORT

MAY 2008

POLICE: Arrests: Total Adult Arrests 74; Total Juvenile Arrests 10; Summons/Citations Issued 18. Incidents: Total Calls 1,961; Security Checks Performed-Residences & Business Locations 167; Incident Cases Reported 98; Crimes Against Property Reported 132; Crimes Against Persons Reported 91; Accident Reports 90; Traffic citations Issued 131; Alarms 104; Miles of Road Patrol (Mileage from previous month) 57,667. Officers: Compensatory Hours Used 116.0; Sick Hours Used 190.0; Personal Hours Used 80.0; Compensatory Hours Earned 1,062.5; Overtime Hours Earned 349.7.

 


 