Construction Project Updates

10/14/2019

****UPDATED/ONGOING****
LINCOLN WAY STREETSCAPE-
click here for graphic
CONTRACTOR: Central Allied Enterprises, Inc.
ROAD CLOSED: Lincoln Way E (SR172) between ERIE ST and 1ST ST SE to vehicular traffic (July 18th for 90 Days).
Pedestrian traffic to local businesses will be OPEN.
Free Parking (lots and side street parking) available. See Downtown Detour and Parking Map for locations

Detour and Roadway signage is installed and being monitored for adjustments.

South Bound SR241 Detour.
Use 3rd St SE to Tremont Ave SE to Erie Street.

The Engineering Department is actively monitoring the DETOUR and will be making adjustments as necessary to minimize traffic issues. Please report any concerns you may have to Engineering at 330-830-1722 and we will look into it immediately. Thank you for your patience.

We want to keep the community updated on streetscape and what is coming up in the project.
What has been accomplished so far with the streetscape project?
Central Allied Enterprises, Inc; Contractor
CLOSED the road and installed detour signage. The City is monitoring and making adjustments as necessary.
Drainage structures have been installed.
Removed and graded the intersection of Erie Street, 1st St NE, and the mid-block crossing.
Sidewalk has been removed from 1st St SE to 1st St SW.
Excavated and filled basement voids under various sidewalks.
Rough graded existing sidewalk areas.
Installed electrical conduits for traffic and lighting.
Installed pull boxes.
Disconnected and removed traffic signals and lighting.
Formed and poured curb curb at 1st St SE intersection.
Removed concrete/steel beams at 1st St SE SW corner.
Underdrains installed.
Installed light pole foundations
Asphalt layer for brick pavers at 1st St intersection
Installed brick pavers in crosswalks at 1st St intersection.
Installed traffic signal foundations
Adjusted catch basins to grade.
Completed grading for new sidewalks and curbs.
Completed 1st St NE intersection pavers.
Completed electrical conduit to mid block crossing.
Replaced broken collapsed 24″ storm sewer.

What is expected to happen this week?
Pouring new sdewalks.
Installing brick pavers
Installing signal, lighting wire

Any other comments or information Massillon residents should be aware of?
The City has hired JMT, Inc. as their Construction Inspector and Administrator.
There is an inspector on site, continually working in conjunction with the City, the Contractors, and Business owners.
We are monitoring traffic patterns and signal timing of the traffic signals in the area, making adjustments as needed
Any questions or concerns from the public or business owners can be addressed by contacting Engineering at 330-830-1722.

RICHVILLE DR SE IMPROVEMENT PROJECT
CONTRACTOR: Northstar Asphalt, N. Canton, Ohio
Pavement markings completed. School Zone signage to be installed in October.

2019 STREET RESURFACING PROJECT and TARGET AREA STREET RESURFACING
CONTRACTOR: Superior Paving and Materials, N. Canton, Ohio
Contractor working on catch basins, drainage, and curb ramps this week on NE side.
NW, SW, SE streets completed.

2019 CATCH BASIN REPLACEMENT PROJECT I
Replacing various Catch Basins throughout the City.
CONTRACTOR: Pryor Property Services, LLC

2019 OPWC 27TH ST/JACKSON AVE RESURFACING PROJECT
CONTRACTOR: Superior Paving and Materials, N. Canton, Ohio

2019 CATCH BASIN REPLACEMENT PROJECT II
Replacing various Catch Basins throughout the City.
CONTRACTOR: Holderbaum Sewer and Drain

SPRINGHILL SETTLEMENT UNDERDRAINS PHASE II
Installing underdrains at the back of curb.
CONTRACTOR: Albatross Management to begin in November.

AUGUSTA DR SE UNDERDRAIN PROJECT PHASE I
Installing underdrains at the back of curb.
CONTRACTOR: Pryor Property Services to begin in October.

UPCOMING CONSTRUCTION PROJECTS:

2019 MUNICIPAL ROAD- ERIE STREET SOUTH RESURFACING
SR 21 to Oakwood Cemetary
To be re-bid in January.