Construction Project Updates

6/25/2019

LINCOLN WAY STREETSCAPE- click here for graphic
CONTRACTOR: Central Allied Enterprises, Inc.
Anticipated closure of Lincoln Way E between ERIE ST and 1ST ST SE to vehicular traffic expected (June, July, August). Pedestrian traffic to local businesses will be OPEN. Addtional directional signage will be installed. Detour and Roadway signage being installed.
Parking lots and side street parking available.
Downtown Detour and Parking

****ONGOING****
6/24/2019-7/1/2019 DURING WORKING HOURS, Weather Permitting
LINCOLN WAY- Eastbound/Westbound- THRU TRAFFIC- one lane each direction.
Temporary closure of side-streets @ Lincoln Way. Northbound and Southbound left turn lanes
at Lincoln Way restricted.
South Bound SR241 Detour. Use 3rd St SE to Tremont Ave SE to Erie Street.

UTILITIES:
June: Dominion Energy installing new medium pressure 8″ line on south side of Lincoln Way beginning at 1st St SW and continuing east to 3rd St SE.
Temporary lane closures in progress.
June: Aqua Ohio
is installing new 12″ water main on north side to replace existing 100+yr old water main beginning at 1st St NW.
Temporary lane closures in progress.

RICHVILLE DR SE IMPROVEMENT PROJECT
The Roadway is CLOSED to THRU TRAFFIC- LOCAL TRAFFIC ONLY.

CONTRACTOR: Northstar Asphalt, N. Canton, Ohio
Pavement markings to be completed. School Zone signage to be installed

UTILITIES:

LINCOLN WAY WEST BROOKFIELD CREEK BOX CULVERT (ODOT project)
****ONGOING****
LINCOLN WAY WEST (BETWEEN 29TH ST NW and 32ND ST NW) CLOSED TO THRU TRAFFIC EASTBOUND and WESTBOUND JUNE 3, 2019 FOR 30 DAYS.
DETOUR ROUTE POSTED BY ODOT.

CONTRACTOR:
Contract awarded by ODOT and will be overseen and inspected by ODOT.
June 3rd to August 1st

UTILITIES:

2019 STREET RESURFACING PROJECT and TARGET AREA STREET RESURFACING
CONTRACTOR: Superior Paving and Materials, N. Canton, Ohio
Contractor working on catch basins and curb ramps this week.

SR21 COXEY PEDESTRIAN BRIDGE REPLACEMENT
Replace pedestrian/bike bridge over State Route 21- expected July 1, 2019
CONTRACTOR: Shook Company LLC
During the placement of the new structure over SR21, there will be intermittent road closures between Lillian Gish Blvd and Cherry Road. Detour route will be posted. Work to take place between 6pm and 6am.

2019 CATCH BASINB REPLACEMENT PROJECT I
Replacing various Catch Basins throughout the City- expected late-June 2019
CONTRACTOR: Pryor Property Services, LLC

UPCOMING CONSTRUCTION PROJECTS:

2019 CATCH BASIN REPLACEMENT PROJECT II
July 2019

SPRINGHILL SETTEMENT UNDERDRAINS PHASE II
July 2019

ST ANDREWS ESTATES- AUGUSTA DR SE UNDERDRAINS PHASE I
July 2019

2019 MUNICIPAL ROAD- ERIE STREET SOUTH RESURFACING
SR 21 to Oakwood Cemetary
August 2019

2019 OPWC 27TH ST/JACKSON AVE RESURFACING PROJECT
Hankins Rd NE to Harsh Ave SE
August 2019